Leave us your email address and we'll send you all the new jobs according to your preferences.
Senior Electrical Engineer - Data Centre Construction
Posted 20 days 6 hours ago by 3D Personnel Ltd
Location: Blyth, Northumberland
Our client is looking to appoint an experienced Senior Electrical Engineer to manage electrical engineering and subcontractor delivery on a major data centre development in Blyth, Northumberland.
The successful candidate will have substantial experience delivering electrical packages within a main contracting or M&E contracting environment, including previous data centre project experience.
The RoleReport to the MEP Lead and oversee electrical construction and engineering delivery
Manage electrical subcontractors and coordinate installation activities
Oversee electrical systems including power distribution, containment, lighting and associated services
Coordinate technical drawings, installation details and design interfaces
Review engineering documentation, technical submissions and construction information
Monitor programme progress, installation sequencing and subcontractor performance
Ensure electrical works comply with approved specifications and safety requirements
Manage documentation for inspections, testing, handover and quality compliance
Oversee preparation of electrical test packs and handover records
Ensure subcontractors maintain high standards of health and safety
10+ years' experience within an M&E contracting environment
Previous data centre construction experience is essential
Degree in Electrical Engineering
Strong technical understanding of electrical building services and power distribution systems
Proven experience managing electrical subcontractors on large construction projects
Good understanding of installation coordination, testing and handover
Excellent communication, leadership and technical problem-solving skills
Candidates living within 60 miles of Blyth will receive strong preference, with those within 90 miles also considered favourably.
For qualifying candidates living more than 60 miles away, Monday to Thursday accommodation and a £160 weekly tax-free allowance may be provided, subject to acceptable proof of address and applicable tax rules.
Flights and accommodation are also available for suitable candidates travelling from Ireland and mainland Europe on a 10 days on / 4 days off rotation.
3D Personnel Ltd
Related Jobs
HGV 1 Driver £1000 SIGN ON BONUS
- £21.40 - £29.13 Hourly
- Berkshire, Bracknell, United Kingdom, RG12 8YA
Class 1 Fridge Drivers
- Lincolnshire, Grimsby, United Kingdom, DN32 9AY
HGV 1 Shunter Driver
- £18.50 - £23 Hourly
- Warwickshire, Coventry, United Kingdom, CV1
Class 1 Driver
- £15.30 Hourly
- Somerset, Taunton, United Kingdom, TA1 2PX
HGV Class 2 - 4 days on 4 days off
- £17.01 - £28.28 Hourly
- Northamptonshire, Northampton, United Kingdom, NN4 9BD