Leave us your email address and we'll send you all the new jobs according to your preferences.
BIM Coordinator - MEP / Data Centre Construction
Posted 39 minutes 33 seconds ago by 3D Personnel Ltd
3D Personnel are recruiting on behalf of a leading international main contractor specialising in the delivery of major data centre and mission-critical construction projects across the UK and Europe.
Our client is seeking an experienced BIM Coordinator with a strong MEP background to support the digital coordination and engineering delivery of a major data centre development in Blyth, Northumberland.
This is an excellent opportunity for a BIM professional experienced in technically complex construction projects, with particular emphasis on mechanical and electrical building services coordination.
Location: Blyth, Northumberland The Role- Coordinate MEP building services models and associated BIM deliverables
- Manage 2D and 3D coordination activities across multiple construction disciplines
- Carry out clash detection and support resolution of design and construction interfaces
- Coordinate BIM information between design consultants, subcontractors and site engineering teams
- Monitor and manage BIM coordination milestones throughout the construction programme
- Ensure models and drawings reflect current technical information and design changes
- Attend coordination meetings and support resolution of technical modelling issues
- Assist with BIM quality standards, documentation and model management
- Provide technical guidance and support to junior BIM staff
- Work closely with design, mechanical, electrical and CSA teams to maintain coordinated project information
- Minimum 4 years' BIM experience across multiple large-scale construction projects
- Degree in Engineering or a relevant discipline
- Strong Revit experience with a clear MEP bias is essential
- AutoCAD experience preferredNavisworks experience desirable
- Proven experience in clash detection and multidisciplinary model coordination
- Strong understanding of mechanical and electrical building services installations
- Data centre or mission-critical construction experience advantageous
Candidates located within 60 miles of Blyth are strongly preferred, with those within 90 miles also considered favourably.
- Qualifying candidates living more than 60 miles away may receive Monday to Thursday accommodation and a £160 weekly tax free allowance, subject to satisfactory proof of address and applicable tax rules.
- Candidates from Ireland and mainland Europe are also encouraged to apply, with flights and accommodation available on a 10 days on / 4 days off rotation.
3D Personnel Ltd
Related Jobs
Field Service Engineer
- Liverpool, United Kingdom
BIM Coordinator MEP for Data Centre Projects
- England, United Kingdom
People-First Production Leader
- Midlands, United Kingdom
Project Engineer Staines on Thames Chubb Operations
- Berkshire, Reading, United Kingdom, RG317
Transformer Site Engineer - On-Site Installations & Testing
- Yorkshire, Leeds, United Kingdom, LS1 8